Improve the podium at level 5

Cover the floor with artificial grass and stones; also, install new covers on the AC units. The estimated cost of the project is between 5kHK$ and 60kHK$, depending on the scope and contractor.

This area was orginal cover with black insulation material, and the borders facing the swimming pool were painted in the same yellow color as the building.

Artificial plants in the corridors

Install artificial plants in the garden cages outside the windows of the corridors on all the floors from 5 to 11.

The original design of the building included these plants, but they were removed and never replaced. The estimated cost of this project ranges from 10kHK$ to 20khk$ depending on the type of artificial plants and the contractor.